Video: Building a Beach in Sagaponack
1 minute
01/31/2014
First Coastal used a drone equipped with a camera to capture the sand replenishment project going on in Sagaponack and Bridgehampton. The multi-million-dollar project, which spans several miles, is designed to bolster the beaches to protect from storms. Sand is being funneled in from the ocean to the shore. Backhoes
This video was taken Thursday at Potato Road, Sagaponack.